• Thanks for stopping by. Logging in to a registered account will remove all generic ads. Please reach out with any questions or concerns.

Replacing the Subs

I agree but nevertheless Seaspan says they have capacity and a trained workforce. Hopefully politics don't take priority over common sense.
Someone should ask them to work backwards from 2035 and ask them how a sub will be built by them and turned over to the RCN by that date. It certainly would not pass the smell test.
 
Admittedly I’m mainly following AUKUS since my wife is involved, but looking at the timelines — IF Canada was to consider joining the modern SSN kids with AUKUS, like the Aussies there would be a significant pipeline requirement for crews.

Which from OS reports looks sort of like:
1) Training
2) OJT on USN boats
3) Split Crewing of boats
4) Pure Crewing of ‘leased’ boats.
5) AUKUS boats being operational in the Navy.

Then there is domestic infrastructure.

I suspect that 2045 is a realistic time frame for if Canada was to get involved before there would be a AUKUS with a Canadian home port, and 2065 before a 8-12 fleet was reached.
 
Back
Top